New footpaths were required on Kitkatts Road, Canvey Island, so Lynch Limited were called in by Ringway Jacobs to complete the job. The old surface was removed and the gorund prepared before a new surface was laid along the whole stretch. The job took 3 weeks and was completed between 6/01/2020 and 25/01/2020.